Replace diesel runtime with battery storage.
TOBOR BESS can supply backup power, store solar energy and reduce generator runtime. The right system depends on your peak load, outage duration and charging supply. We calculate savings from your site data.
Compare the same energy delivered.
A 30 kW average load running eight hours a day for 300 days uses 72,000 kWh per year. This example explains the calculation; it is not a measured customer result or a project quotation.
| Input or result | Diesel generator | Battery storage |
|---|---|---|
| Energy delivered | 72,000 kWh | 72,000 kWh |
| Assumed energy supply | 8 L/hour at ₹100/L | ₹8/kWh input; 90% round-trip efficiency |
| Annual fuel or charging cost | ₹19,20,000 | ₹6,40,000 |
| Fuel or charging cost per delivered kWh | ₹26.67 | ₹8.89 |
| Maintenance, installation and capital | Assess from logs and quotations | Assess from the proposed design |
The energy-cost difference is not net savings or a payback estimate. Include maintenance, auxiliary consumption, degradation, finance and replacement costs. Eight continuous hours at 30 kW requires 240 kWh delivered, plus capacity allowances for losses and operating limits.
Start with power. Then size the energy.
These are starting points based on generator apparent power and an assumed 0.8 power factor. They do not establish backup duration or motor-start capability. Confirm load, usable kWh, transfer time and charging constraints before selecting a model.
| Existing generator | Explore TOBOR model | Application starting point |
|---|---|---|
| 30 kVA | MTX-S30 | Small factory unit, clinic, restaurant · 30 kW cabinet |
| 62.5 kVA | MTX-S60 | MSME plant, 3-star hotel, mid-size hospital wing · MTX-H60 if you add solar |
| 125–160 kVA | PTX-125 | Multi-line factory, 4-star hotel, full hospital |
| 250–320 kVA | PTX-250 | Large MSME, IT park floor, data centre row · 257 kWh |
| 500–625 kVA | PTX-500 | Steel, textile and pharma plants, campus microgrid · 514 kWh |
| 1,250 kVA | PTX-1000 | HT-connected plant, data-centre campus · 1.03 MWh |
| 2,500 kVA | PTX-2000 | Multi-DG plant room, large industrial estate · 2.06 MWh |
| 3 MVA and above | CTX-5000 | DG farms, solar parks, utility sites · 2.5 MW / 5.06 MWh per 20 ft container, up to the 10 MW CTX-B20 block |
Check the installation and compliance requirements.
Reducing diesel runtime does not automatically remove monitoring, permit or operating obligations. Confirm the requirements for any retained generator and the proposed battery installation with the relevant authority and your project engineer.
DG standards, CEMS and official sources →Operator questions, answered.
Can a battery replace my diesel generator?
How fast does TOBOR BESS transfer during an outage?
What is the running cost of DG versus BESS?
Does installing BESS remove CEMS or other compliance requirements?
How long is the payback period?
Build a proposal around your load.
Send interval load data, outage records, fuel logs, electricity bills and available solar generation. We will assess the power, energy and operating plan together.
Talk to TOBOR →