Cut your maximum demand bill 40%. Replace your diesel too.
Your factory pays two bills: the diesel bill (DG set) and the peak-demand bill (DISCOM). TOBOR BESS cuts both at the same time — and pays back in under 4 years on a typical MSME load.
Typical MSME factory · 60 kVA · 8 h/day
Diesel + demand charges. Both, gone.
Real MSME plant · 60 kVA load · 8 h/day · ₹9.50/unit tariff · ₹900/kVA demand charge
| Cost line | Today | With TOBOR |
|---|---|---|
| Diesel fuel (17,520 L/yr at ₹100/L) | ₹17.5L | ₹0 |
| DG maintenance + oil + AMC | ₹2.5L | ₹0.35L |
| Site compliance costs | Confirm applicable requirements | Assess proposed installation |
| Peak demand charge (₹900/kVA · 60 kVA) | ₹6.5L/yr | ₹3.9L/yr |
| Energy charge (peak-hour units) | ₹12L/yr | ₹7.2L/yr |
| Total annual outflow | ₹40–43L | ₹11–12L |
Annual savings
Payback in 3–4 years on an MTX-S60 (60 kW) + 80 kWp solar. After year 4, the savings are pure margin.
Why operators in this segment pick TOBOR.
Demand-charge shaving
EMS automatically discharges the battery during peak-demand windows. Most MSME factories see 30–45% reduction in monthly demand charge alone.
Solar self-consumption
Pair with rooftop solar to charge the battery for free. ₹2–3/unit running cost vs ₹9–10/unit grid + ₹18+/unit diesel.
Backup matched to the load
MTX Standard restarts automatically in ~30–40 s for loads that tolerate a short gap. MTX Hybrid switches in under 10 ms for sensitive lines. PTX systems transfer through PCC switching engineered to your single-line design.
Assess site compliance requirements
Requirements depend on the applicable official directions and site consent conditions. Confirm any monitoring or reporting obligation with the relevant authority. Retaining or downsizing a generator does not automatically remove its obligations.
Same cells as utility-scale
PTX-250 and up run the same 314 Ah LFP cells (~8,000 cycles) as our CTX containers; MTX cabinets use 100 Ah LFP (~6,000 cycles). Modular power blocks. Cloud monitoring on every unit.
MNRE & SIDBI finance
C&I CAPEX subsidies (20–30% in tier-2/3) plus SIDBI/NABARD green loans for the balance. We help structure the project paperwork.
Pick the size, or let us pick for you.
The calculator selects automatically based on your bill and load. Or skim the picker below.
MTX-S30 / MTX-S60
30–60 kW · sized to runtime
MSME unit · 30–60 kVA DG replacement · 1–2 shift operations
PTX-125
125 kW · sized to runtime
Multi-line factory · 100–125 kVA DG · 3-shift continuous
PTX-500
500 kW · 514.5 kWh
Steel, textile, pharma plants · 500 kVA DG · maximum-demand cuts
PTX-1000 / PTX-2000
1–2 MW · 1.03–2.06 MWh
HT-connected plants · industrial parks · open-access solar buyers
Bigger site? Industrial parks and multi-plant campuses step up to CTX 20 ft containers — 2.5 MW / 5.06 MWh each, stacked into a 10 MW / 20.26 MWh, 33 kV block.
Questions, answered.
Can we keep the DG as backup and use the BESS primarily?
Will the BESS interrupt three-shift production during install?
What's the payback on demand-charge shaving alone (no DG replacement)?
Can the EMS integrate with our existing SCADA / MES?
What's the footprint of a 60 kW cabinet?
Stop burning diesel. Start cutting demand charges.
In-house BMS, EMS & PCS · Made in Gurugram