Critical power. Zero diesel. Zero noise.
Hospitals can't afford 5-second DG warm-ups during a code-blue. 4-star hotels can't afford diesel smell drifting into the lobby. TOBOR BESS gives you under-10 ms transfer on MTX Hybrid critical buses and silent, fume-free runtime sized to your outage profile — every day.
Hospitals · hotels · operating theatres · cold-chain
Diesel is the cheap option until it costs you a patient.
200-bed multi-specialty hospital · 240 kW critical load · 12 outages/month
| Cost line | Today | With TOBOR |
|---|---|---|
| Diesel fuel (DG running ~60 h/month) | ₹8.6L/yr | ₹0 |
| DG maintenance + AMC (240 kVA × 2 redundant) | ₹4.2L/yr | ₹0.5L/yr |
| Site compliance costs | Confirm applicable requirements | Assess proposed installation |
| UPS battery replacement (lead-acid, 4-yr cycle) | ₹3L/yr amortised | Replaced by BESS |
| Transfer-time risk (OT, ICU, MRI) | 5–10 sec DG ATS | <10 ms MTX Hybrid bus · engineered PCC on PTX |
| Total annual outflow | ₹17L+ | ₹3L |
Annual savings
Payback in 3.5–4 years on a PTX-250 (250 kW / 257.2 kWh). The harder-to-quantify upside: no DG warm-up gap during a procedure.
Why operators in this segment pick TOBOR.
Fast transfer for OT / ICU
Operating theatres, ventilators, MRI, cold-chain — none of them tolerate a 5-second DG warm-up. The MTX Hybrid switches its critical bus in under 10 ms; PTX systems transfer through PCC switching engineered to your single-line diagram.
Silent operation
No engine, no exhaust stack — just cooling fans. Guest-facing hotel zones stay quiet during outages. Hospital wards don't get a DG roar through the night.
Zero local emissions
No NO₂, no PM2.5, no diesel smell drifting through hotel lobbies or hospital corridors. Pollution Control Board audit risk eliminated.
Replaces lead-acid UPS too
Many hospitals run a separate lead-acid UPS for critical loads. An MTX Hybrid critical bus covers fast transfer and DG-class endurance on one platform; on PTX sites we size the UPS down to the most sensitive loads.
Pairs with critical-load segregation
Most hospitals already split critical (OT, ICU, lifts) vs non-critical (admin, F&B). BESS sits on the critical bus; existing DG can stay for non-critical multi-hour backup.
8,000-cycle LFP · modular power
PTX-250 and up run 314 Ah LFP cells rated ~8,000 cycles. Power is built from paralleled 125 kW modules, so capacity grows with the campus.
Pick the size, or let us pick for you.
The calculator selects automatically based on your bill and load. Or skim the picker below.
MTX-H60
50 / 60 kVA · sized to runtime
Boutique hotel · 40-bed clinic · single OT · critical bus with < 10 ms transfer and rooftop solar
PTX-125
125 kW · sized to runtime
4-star hotel · 100-bed hospital · multi-specialty OT block
PTX-250
250 kW · 257.2 kWh
5-star hotel · 200-bed hospital · ICU + imaging + OT campus
PTX-1000 / PTX-2000
1–2 MW · 1.03–2.06 MWh
Medical college campus · integrated township · large resort with central plant
Running a multi-hospital campus or a hotel cluster on one HT connection? CTX 20 ft containers (2.5 MW / 5.06 MWh each) scale to a 10 MW / 20.26 MWh, 33 kV block.
Questions, answered.
How does this compare to our existing UPS + DG combo?
Will the BESS handle MRI / CT load spikes?
What if we lose grid for 6+ hours?
Can we integrate the BESS alarms into our existing BMS?
What's the cost vs continuing with our current DG + UPS setup?
Your patients can't feel a 5-second outage. Neither should you.
In-house BMS, EMS & PCS · Made in Gurugram